Wind farm

Viertkamp wind farm

Viertkamp wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2020. It is operating and is owned by Windpark Viertkamp GmbH & Co. KG.

In 2024 it settled 39.2 GWh of electricity, a load factor of 32.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2039, with later phases to 2040, after which that output is sold at market prices.

Measured performance vs peers
32.0%
This assetCohort median 23.8%Middle half

This asset produced at 32.0% of nameplate in 2024 — the 93rd percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Windpark Viertkamp GmbH & Co. KG
Technology
Onshore
Measured output 2024
39.2 GWh
Load factor
32.0%
EEG support ends
2039
Peer percentile
93rd
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE940739038489); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets