Wind farm

Viersen Boisheimer Nette wind farm

Viersen Boisheimer Nette wind farm is a wind farm in Germany with a capacity of 22 MW, commissioned in 2024. It is operating.

In 2024 it settled 6.5 GWh of electricity, a load factor of 3.4%. That volume was settled under EEG support.

Capacity
22 MW
Country
Germany
Status
operating
Commissioned
2024
Owner
Technology
Onshore
Measured output 2024
6.5 GWh
Load factor
3.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap