Wind farm

Krautheim-Eckigbreit wind farm

Krautheim-Eckigbreit wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2022. It is operating and is owned by EE BürgerEnergie Krautheim GmbH & Co. KG.

In 2024 it settled 21.1 GWh of electricity, a load factor of 18.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
18.6%
This assetCohort median 23.8%Middle half

This asset produced at 18.6% of nameplate in 2024 — the 19th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
EE BürgerEnergie Krautheim GmbH & Co. KG
Technology
Onshore
Measured output 2024
21.1 GWh
Load factor
18.6%
EEG support ends
2042
Peer percentile
19th
Grid connection
HS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE990588174463); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets