Wind farm

Helmstadt wind farm

Helmstadt wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2012. It is operating and is owned by ENGIE WSW Windpark Helmstadt GmbH & Co.KG.

In 2024 it settled 21.7 GWh of electricity, a load factor of 19.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, after which that output is sold at market prices.

Measured performance vs peers
19.0%
This assetCohort median 21.9%Middle half

This asset produced at 19.0% of nameplate in 2024 — the 24th percentile of German wind commissioned 2010-2014 (128 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
ENGIE WSW Windpark Helmstadt GmbH & Co.KG
Technology
Onshore
Measured output 2024
21.7 GWh
Load factor
19.0%
EEG support ends
2032
Peer percentile
24th
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE902843594763); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets