Wind farm

Berglichter wind farm

Berglichter wind farm is a wind farm in Germany with a capacity of 13 MW, commissioned in 2017. It is operating and is owned by CEE Windpark Berglicht GmbH & Co. KG.

In 2024 it settled 13.3 GWh of electricity, a load factor of 11.7%. Part of that volume was sold outside EEG support, so it is partly merchant.

Its EEG support runs to the end of 2044, after which that output is sold at market prices.

Measured performance vs peers
11.7%
This assetCohort median 24.7%Middle half

This asset produced at 11.7% of nameplate in 2024 — the 0th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2017
Owner
CEE Windpark Berglicht GmbH & Co. KG
Technology
Onshore
Measured output 2024
13.3 GWh
Load factor
11.7%
EEG support ends
2044
Peer percentile
0th
Grid connection
MS
State
Rheinland-Pfalz

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE964386953339); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets