Wind farm

Lehrte (Eurowind) wind farm

Lehrte (Eurowind) wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2009. It is operating and is owned by Windpark Lehrte III UG & Co. KG.

In 2024 it settled 13.6 GWh of electricity, a load factor of 13.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
13.0%
This assetCohort median 16.3%Middle half

This asset produced at 13.0% of nameplate in 2024 — the 27th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Windpark Lehrte III UG & Co. KG
Technology
Onshore
Measured output 2024
13.6 GWh
Load factor
13.0%
EEG support ends
2029
Peer percentile
27th
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE934380216754); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap