Wind farm

Jürgenshagen wind farm

Jürgenshagen wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2002. It is operating and is owned by WPD AG.

In 2024 it settled 12.7 GWh of electricity, a load factor of 12.1%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
12.1%
This assetCohort median 16.3%Middle half

This asset produced at 12.1% of nameplate in 2024 — the 20th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2002
Owner
WPD AGresearched
Technology
Onshore
Measured output 2024
12.7 GWh
Load factor
12.1%
Peer percentile
20th

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against wpd.de; commissioning date and grid connection from EEG-Anlagenstammdaten. All Germany assets