Wind farm

Gussenstadt wind farm

Gussenstadt wind farm is a wind farm in Germany with a capacity of 14 MW, commissioned in 2018. It is operating and is owned by Windpark Gussenstadt GmbH & Co. KG.

In 2024 it settled 20.5 GWh of electricity, a load factor of 16.7%. That volume was settled under EEG support.

Its EEG support ran to the end of 2023.

Measured performance vs peers
16.7%
This assetCohort median 24.7%Middle half

This asset produced at 16.7% of nameplate in 2024 — the 7th percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
14 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Windpark Gussenstadt GmbH & Co. KG
Technology
Onshore
Measured output 2024
20.5 GWh
Load factor
16.7%
EEG support ends
2023
Peer percentile
7th
Grid connection
HS
State
Baden-Württemberg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE996501344180); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets