Wind farm

Brugger wind farm

Brugger wind farm is a wind farm in Germany with a capacity of 12 MW, commissioned in 2014. It is operating.

In 2024 it settled 23.6 GWh of electricity, a load factor of 22.5%. That volume was settled under EEG support.

Capacity
12 MW
Country
Germany
Status
operating
Commissioned
2014
Owner
Technology
Onshore
Measured output 2024
23.6 GWh
Load factor
22.5%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap