Wind farm

Feistelberg wind farm

Feistelberg wind farm is a wind farm in Germany with a capacity of 11 MW, commissioned in 2019. It is operating and is owned by REWAG REGENSBURGER ENERGIE- UND WASSERVERSORGUNG AG & CO KG.

In 2024 it settled 21.7 GWh of electricity, a load factor of 22.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2039, after which that output is sold at market prices.

Measured performance vs peers
22.5%
This assetCohort median 24.7%Middle half

This asset produced at 22.5% of nameplate in 2024 — the 31st percentile of German wind commissioned 2015-2019 (215 assets with metered output).

Capacity
11 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
REWAG REGENSBURGER ENERGIE- UND WASSERVERSORGUNG AG & CO KG
Technology
Onshore
Measured output 2024
21.7 GWh
Load factor
22.5%
EEG support ends
2039
Peer percentile
31st
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE983873854720); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets