Wind farm

Mittelstenahe wind farm

Mittelstenahe wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2006. It is operating and is owned by Energiequelle GmbH.

In 2024 it settled 12.8 GWh of electricity, a load factor of 14.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2026, with later phases to 2029, after which that output is sold at market prices.

Measured performance vs peers
14.6%
This assetCohort median 16.3%Middle half

This asset produced at 14.6% of nameplate in 2024 — the 36th percentile of German wind commissioned pre-2010 (182 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2006
Owner
Energiequelle GmbHresearched
Technology
Onshore
Measured output 2024
12.8 GWh
Load factor
14.6%
EEG support ends
2026
Peer percentile
36th
Grid connection
HS/MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against energiequelle.de; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets