Dobberkau Erweiterung wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2016. It is operating and is owned by ERG Wind Weselberg GmbH & Co. KG Standort Dobberkau.
In 2024 it settled 12.0 GWh of electricity, a load factor of 13.7%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.
This asset produced at 13.7% of nameplate in 2024 — the 3rd percentile of German wind commissioned 2015-2019 (215 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE915175386760); commissioning date and grid connection from EEG-Anlagenstammdaten. All Germany assets