Wind farm

Bernsdorf-Gersdorf wind farm

Bernsdorf-Gersdorf wind farm is a wind farm in Germany with a capacity of 10 MW, commissioned in 2020. It is operating and is owned by Sabowindpark Gersdorf 3 GmbH & Co. KG.

In 2024 it settled 27.3 GWh of electricity, a load factor of 31.1%. That volume was settled under EEG support.

Its EEG support ran to the end of 2018.

Measured performance vs peers
31.1%
This assetCohort median 23.8%Middle half

This asset produced at 31.1% of nameplate in 2024 — the 90th percentile of German wind commissioned 2020 or later (140 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
Sabowindpark Gersdorf 3 GmbH & Co. KG
Technology
Onshore
Measured output 2024
27.3 GWh
Load factor
31.1%
EEG support ends
2018
Peer percentile
90th
Grid connection
MS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE905291723570); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets