Solar farm

Zeithain 6.3 solar farm

Zeithain 6.3 solar farm is a solar farm in Germany with a capacity of 5.1 MW, commissioned in 2019. It is operating.

In 2024 it settled 5.1 GWh of electricity, a load factor of 11.4%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
5.1 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
Technology
PV
Measured output 2024
5.1 GWh
Load factor
11.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap