Solar farm

Zabakuck 4 solar farm

Zabakuck 4 solar farm is a solar farm in Germany with a capacity of 1.6 MW, commissioned in 2019. It is operating and is owned by Wattner SunAsset Solarkraftwerk 078 GmbH & Co. KG.

In 2024 it settled 1.2 GWh of electricity, a load factor of 8.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2039, after which that output is sold at market prices.

Measured performance vs peers
8.4%
This assetCohort median 10.0%Middle half

This asset produced at 8.4% of nameplate in 2024 — the 15th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
1.6 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
Wattner SunAsset Solarkraftwerk 078 GmbH & Co. KG
Technology
PV
Measured output 2024
1.2 GWh
Load factor
8.4%
EEG support ends
2039
Peer percentile
15th
Grid connection
HS/MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE909048085294); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets