Solar farm

Wolgast solar farm

Wolgast solar farm is a solar farm in Germany with a capacity of 7.9 MW, commissioned in 2013. It is operating and is owned by WG Projektmanagement Inh. Wolfgang Gehrlicher e. K..

In 2024 it settled 7.5 GWh of electricity, a load factor of 10.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, after which that output is sold at market prices.

Measured performance vs peers
10.9%
This assetCohort median 10.5%Middle half

This asset produced at 10.9% of nameplate in 2024 — the 62nd percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
7.9 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
WG Projektmanagement Inh. Wolfgang Gehrlicher e. K.
Technology
PV
Measured output 2024
7.5 GWh
Load factor
10.9%
EEG support ends
2033
Peer percentile
62nd
Grid connection
MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets