Solar farm

Waltershausen solar farm

Waltershausen solar farm is a solar farm in Germany with a capacity of 3.3 MW, commissioned in 2016. It is operating and is owned by ST Solarinvestitionsgesellschaft Mecklenburg 3 mbH & Co. KG.

In 2024 it settled 5.4 GWh of electricity, a load factor of 18.7%. That volume was settled under EEG support.

Its EEG support runs to the end of 2036, after which that output is sold at market prices.

Measured performance vs peers
18.7%
This assetCohort median 10.0%Middle half

This asset produced at 18.7% of nameplate in 2024 — the 100th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
3.3 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
ST Solarinvestitionsgesellschaft Mecklenburg 3 mbH & Co. KG
Technology
PV
Measured output 2024
5.4 GWh
Load factor
18.7%
EEG support ends
2036
Peer percentile
100th
Grid connection
MS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE995578085187); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets