Tutow I Solarpark Freiflächenanlage solar farm is a solar farm in Germany with a capacity of 6.8 MW, commissioned in 2009. It is operating and is owned by Mainzer Erneuerbare Energien GmbH.
In 2024 it settled 5.4 GWh of electricity, a load factor of 9.1%. That volume was settled under EEG support.
Its EEG support runs to the end of 2029, after which that output is sold at market prices.
This asset produced at 9.1% of nameplate in 2024 — the 22nd percentile of German solar commissioned pre-2010 (418 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE964767320101); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets