Solar farm

Solarpark Zernitz solar farm

Solarpark Zernitz solar farm is a solar farm in Germany with a capacity of 6.3 MW, commissioned in 2022. It is operating and is owned by Solarpark Zernitz GmbH & Co. KG.

In 2024 it settled 6.4 GWh of electricity, a load factor of 11.6%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
11.6%
This assetCohort median 9.7%Middle half

This asset produced at 11.6% of nameplate in 2024 — the 88th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
6.3 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Solarpark Zernitz GmbH & Co. KG
Technology
PV
Measured output 2024
6.4 GWh
Load factor
11.6%
EEG support ends
2042
Peer percentile
88th
Grid connection
MS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE903421008184); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap