Solar farm

Solarpark Rüdersdorf I solar farm

Solarpark Rüdersdorf I solar farm is a solar farm in Germany with a capacity of 7.4 MW, commissioned in 2010. It is operating and is owned by CHORUS CleanTech GmbH & Co. Solarpark Rüdersdorf KG.

In 2024 it settled 7.8 GWh of electricity, a load factor of 12.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2030, after which that output is sold at market prices.

Measured performance vs peers
12.0%
This assetCohort median 10.5%Middle half

This asset produced at 12.0% of nameplate in 2024 — the 93rd percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
7.4 MW
Country
Germany
Status
operating
Commissioned
2010
Owner
CHORUS CleanTech GmbH & Co. Solarpark Rüdersdorf KG
Technology
PV
Measured output 2024
7.8 GWh
Load factor
12.0%
EEG support ends
2030
Peer percentile
93rd
Grid connection
MS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE971643437181); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets