Solar farm

Solarpark Rapshagen solar farm

Solarpark Rapshagen solar farm is a solar farm in Germany with a capacity of 9.7 MW, commissioned in 2011. It is operating.

In 2024 it settled 4.6 GWh of electricity, a load factor of 5.4%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.

Capacity
9.7 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Technology
PV
Measured output 2024
4.6 GWh
Load factor
5.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap