Solar farm

Solarpark Junkersdorf I solar farm

Solarpark Junkersdorf I solar farm is a solar farm in Germany with a capacity of 3.1 MW, commissioned in 2022. It is operating and is owned by GFG-Solar.

In 2024 it settled 2.7 GWh of electricity, a load factor of 9.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
9.8%
This assetCohort median 9.7%Middle half

This asset produced at 9.8% of nameplate in 2024 — the 52nd percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
3.1 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
GFG-Solar
Technology
PV
Measured output 2024
2.7 GWh
Load factor
9.8%
EEG support ends
2042
Peer percentile
52nd
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE975536457652); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets