Solar farm

Solarpark Herlheim solar farm

Solarpark Herlheim solar farm is a solar farm in Germany with a capacity of 13 MW, commissioned in 2021. It is operating and is owned by Solarpark Herlheim GmbH & Co. KG.

In 2024 it settled 10.5 GWh of electricity, a load factor of 9.2%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
9.2%
This assetCohort median 9.7%Middle half

This asset produced at 9.2% of nameplate in 2024 — the 41st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
13 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
Solarpark Herlheim GmbH & Co. KG
Technology
PV
Measured output 2024
10.5 GWh
Load factor
9.2%
Peer percentile
41st
Grid connection
MS
State
Bayern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE947503174794); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets