Solar farm

Solarpark Flieden solar farm

Solarpark Flieden solar farm is a solar farm in Germany with a capacity of 3.1 MW, commissioned in 2012. It is operating and is owned by Solarpark Flieden GmbH & Co. KG.

In 2024 it settled 2.8 GWh of electricity, a load factor of 10.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2032, after which that output is sold at market prices.

Measured performance vs peers
10.3%
This assetCohort median 10.5%Middle half

This asset produced at 10.3% of nameplate in 2024 — the 44th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
3.1 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Solarpark Flieden GmbH & Co. KG
Technology
PV
Measured output 2024
2.8 GWh
Load factor
10.3%
EEG support ends
2032
Peer percentile
44th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE946464575961); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap