Solar farm

Solarpark Coswig Süd solar farm

Solarpark Coswig Süd solar farm is a solar farm in Germany with a capacity of 3 MW, commissioned in 2011. It is operating and is owned by Coswig-Solar Management und Service GmbH.

In 2024 it settled 2.9 GWh of electricity, a load factor of 11.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, after which that output is sold at market prices.

Measured performance vs peers
11.0%
This assetCohort median 10.5%Middle half

This asset produced at 11.0% of nameplate in 2024 — the 66th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
3 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Coswig-Solar Management und Service GmbH
Technology
PV
Measured output 2024
2.9 GWh
Load factor
11.0%
EEG support ends
2031
Peer percentile
66th
Grid connection
MS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE932269957187); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets