Solar farm

Solarpark Beetzendorf Teilanlage Lopuszno 1 solar farm

Solarpark Beetzendorf Teilanlage Lopuszno 1 solar farm is a solar farm in Germany with a capacity of 3.8 MW, commissioned in 2019. It is operating and is owned by LHI GII2 PV Beetz Trott 2409 GmbH & Co. KG.

In 2024 it settled 2.5 GWh of electricity, a load factor of 7.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2039, after which that output is sold at market prices.

Measured performance vs peers
7.4%
This assetCohort median 10.0%Middle half

This asset produced at 7.4% of nameplate in 2024 — the 7th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
3.8 MW
Country
Germany
Status
operating
Commissioned
2019
Owner
LHI GII2 PV Beetz Trott 2409 GmbH & Co. KG
Technology
PV
Measured output 2024
2.5 GWh
Load factor
7.4%
EEG support ends
2039
Peer percentile
7th
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE929798159755); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets