Solar farm

Solarpark Bäbelitz GmbH & Co. KG solar farm

Solarpark Bäbelitz GmbH & Co. KG solar farm is a solar farm in Germany with a capacity of 1.1 MW, commissioned in 2010. It is operating and is owned by Solarpark Bäbelitz Betriebsgesellschaft mbH.

In 2024 it settled 967 MWh of electricity, a load factor of 10.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2030, after which that output is sold at market prices.

Measured performance vs peers
10.0%
This assetCohort median 10.5%Middle half

This asset produced at 10.0% of nameplate in 2024 — the 36th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
1.1 MW
Country
Germany
Status
operating
Commissioned
2010
Owner
Solarpark Bäbelitz Betriebsgesellschaft mbH
Technology
PV
Measured output 2024
967 MWh
Load factor
10.0%
EEG support ends
2030
Peer percentile
36th
Grid connection
MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE986173091536); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets