Solar farm

Solarpark Asperg Erste BA 1 solar farm

Solarpark Asperg Erste BA 1 solar farm is a solar farm in Germany with a capacity of 3.1 MW, commissioned in 2007. It is operating.

In 2024 it settled 3.7 GWh of electricity, a load factor of 13.7%. That volume was settled under EEG support.

Capacity
3.1 MW
Country
Germany
Status
operating
Commissioned
2007
Owner
Technology
PV
Measured output 2024
3.7 GWh
Load factor
13.7%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap