Solarkraftwerk IRT solar farm is a solar farm in Germany with a capacity of 8.5 MW, commissioned in 2008. It is operating and is owned by SWT Stadtwerke Trier Versorgungs-GmbH.
In 2024 it settled 7.9 GWh of electricity, a load factor of 10.6%. That volume was settled under EEG support.
Its EEG support runs to the end of 2028, after which that output is sold at market prices.
This asset produced at 10.6% of nameplate in 2024 — the 53rd percentile of German solar commissioned pre-2010 (418 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE901420035330); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets