SIG Wittenberg PW4 solar farm is a solar farm in Germany with a capacity of 7.1 MW, commissioned in 2023. It is operating and is owned by Stadtwerke Leipzig GmbH.
In 2024 it settled 2.5 GWh of electricity, a load factor of 4.0%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.
This asset produced at 4.0% of nameplate in 2024 — the 8th percentile of German solar commissioned 2020 or later (1,271 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE900903161481); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets