Solar farm

PVA Zeithain BA2 solar farm

PVA Zeithain BA2 solar farm is a solar farm in Germany with a capacity of 10 MW, commissioned in 2018. It is operating and is owned by Sunnic Lighthouse Solar Invest 3 GmbH.

In 2024 it settled 10.0 GWh of electricity, a load factor of 11.4%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
11.4%
This assetCohort median 10.0%Middle half

This asset produced at 11.4% of nameplate in 2024 — the 88th percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
10 MW
Country
Germany
Status
operating
Commissioned
2018
Owner
Sunnic Lighthouse Solar Invest 3 GmbH
Technology
PV
Measured output 2024
10.0 GWh
Load factor
11.4%
Peer percentile
88th
Grid connection
HS
State
Sachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE914917708402); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets