Solar farm

PVA Uetteroda solar farm

PVA Uetteroda solar farm is a solar farm in Germany with a capacity of 2.2 MW, commissioned in 2013. It is operating.

In 2024 it settled 1.8 GWh of electricity, a load factor of 9.2%. That volume was settled under EEG support.

Capacity
2.2 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Technology
PV
Measured output 2024
1.8 GWh
Load factor
9.2%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap