PVA St. Gangloff solar farm is a solar farm in Germany with a capacity of 2.2 MW, commissioned in 2014. It is operating.
In 2024 it settled 2.0 GWh of electricity, a load factor of 10.5%. That volume was settled under EEG support.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets