Solar farm

PVA Neuruppin 4 solar farm

PVA Neuruppin 4 solar farm is a solar farm in Germany with a capacity of 1.6 MW, commissioned in 2012. It is operating.

In 2024 it settled 1.5 GWh of electricity, a load factor of 10.4%. That volume was settled under EEG support.

Capacity
1.6 MW
Country
Germany
Status
operating
Commissioned
2012
Owner
Technology
PV
Measured output 2024
1.5 GWh
Load factor
10.4%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap