Solar farm

PVA Mehrum solar farm

PVA Mehrum solar farm is a solar farm in Germany with a capacity of 3 MW, commissioned in 2022. It is operating and is owned by Solarservice 24 GmbH.

In 2024 it settled 514 MWh of electricity, a load factor of 2.0%. It sold essentially all of that volume outside EEG support — it is already merchant. This figure is apportioned across units of the same site that share a registry entry.

Measured performance vs peers
2.0%
This assetCohort median 9.7%Middle half

This asset produced at 2.0% of nameplate in 2024 — the 5th percentile of German solar commissioned 2020 or later (1,271 assets with metered output). Its volume is apportioned across phases sharing one registry entry, so treat the figure as an estimate for this unit and exact for the site.

Capacity
3 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Solarservice 24 GmbH
Technology
PV
Measured output 2024
514 MWh
Load factor
2.0%
Peer percentile
5th
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE937304632494); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets