Solar farm

PVA II solar farm

PVA II solar farm is a solar farm in Germany with a capacity of 18.2 MW, commissioned in 2023. It is operating.

In 2024 it settled 15.4 GWh of electricity, a load factor of 9.6%. Part of that volume was sold outside EEG support, so it is partly merchant.

Capacity
18.2 MW
Country
Germany
Status
operating
Commissioned
2023
Owner
Technology
PV
Measured output 2024
15.4 GWh
Load factor
9.6%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap