Solar farm

PVA Hodenhagen solar farm

PVA Hodenhagen solar farm is a solar farm in Germany with a capacity of 3 MW, commissioned in 2022. It is operating and is owned by Regional- und Energiegenossenschaft Aller-leine-Weser eG.

In 2024 it settled 2.3 GWh of electricity, a load factor of 8.8%. That volume was settled under EEG support.

Its EEG support runs to the end of 2042, after which that output is sold at market prices.

Measured performance vs peers
8.8%
This assetCohort median 9.7%Middle half

This asset produced at 8.8% of nameplate in 2024 — the 35th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
3 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
Regional- und Energiegenossenschaft Aller-leine-Weser eG
Technology
PV
Measured output 2024
2.3 GWh
Load factor
8.8%
EEG support ends
2042
Peer percentile
35th
Grid connection
MS
State
Niedersachsen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE982044494598); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets