PVA Cahnsdorf 2 solar farm is a solar farm in Germany with a capacity of 8.2 MW, commissioned in 2016. It is operating and is owned by EPP Solar Invest 1 GmbH.

In 2024 it settled 429 MWh of electricity, a load factor of 0.6%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
0.6%
This assetCohort median 10.0%Middle half

This asset produced at 0.6% of nameplate in 2024 — the 1st percentile of German solar commissioned 2015-2019 (635 assets with metered output).

Capacity
8.2 MW
Country
Germany
Status
operating
Commissioned
2016
Owner
EPP Solar Invest 1 GmbH
Technology
PV
Measured output 2024
429 MWh
Load factor
0.6%
Peer percentile
1st
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE994587872351); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets