PVA Borna solar farm is a solar farm in Germany with a capacity of 3.5 MW, commissioned in 2005. It is operating and is owned by GEOSOL Kraftwerks- und Grundstücksgesellschaft mbH.
In 2024 it settled 4.4 GWh of electricity, a load factor of 14.3%. That volume was settled under EEG support.
Its EEG support ran to the end of 2025.
This asset produced at 14.3% of nameplate in 2024 — the 99th percentile of German solar commissioned pre-2010 (418 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE938073689825); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets