Solar farm

PVA Bitterfeld Thor 3 solar farm

PVA Bitterfeld Thor 3 solar farm is a solar farm in Germany with a capacity of 6 MW, commissioned in 2009. It is operating and is owned by Thor Solar 3. Projektgesellschaft mbH & Co. KG.

In 2024 it settled 5.4 GWh of electricity, a load factor of 10.3%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
10.3%
This assetCohort median 10.4%Middle half

This asset produced at 10.3% of nameplate in 2024 — the 45th percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
6 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
Thor Solar 3. Projektgesellschaft mbH & Co. KG
Technology
PV
Measured output 2024
5.4 GWh
Load factor
10.3%
EEG support ends
2029
Peer percentile
45th
Grid connection
MS
State
Sachsen-Anhalt

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE921831144483); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets