Solar farm

PVNeustadtGlewe 3 solar farm

PVNeustadtGlewe 3 solar farm is a solar farm in Germany with a capacity of 2.6 MW, commissioned in 2020. It is operating and is owned by LEG Solar Invest 2 GmbH & Co. KG | Verwaltung für eine Gruppe von Anlagenbetreibern.

In 2024 it settled 1.7 GWh of electricity, a load factor of 7.4%. That volume was settled under EEG support.

Its EEG support runs to the end of 2040, after which that output is sold at market prices.

Measured performance vs peers
7.4%
This assetCohort median 9.7%Middle half

This asset produced at 7.4% of nameplate in 2024 — the 18th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
2.6 MW
Country
Germany
Status
operating
Commissioned
2020
Owner
LEG Solar Invest 2 GmbH & Co. KG | Verwaltung für eine Gruppe von Anlagenbetreibern
Technology
PV
Measured output 2024
1.7 GWh
Load factor
7.4%
EEG support ends
2040
Peer percentile
18th
Grid connection
MS
State
Mecklenburg-Vorpommern

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE968147882067); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets