PVFreiflächenanlage Solarpark Pocking 2 WRH9 solar farm is a solar farm in Germany with a capacity of 1.3 MW, commissioned in 2009. It is operating.
In 2024 it settled 212 MWh of electricity, a load factor of 1.9%. That volume was settled under EEG support. This figure is apportioned across units of the same site that share a registry entry.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets