Solar farm

PVAnlage Gertrudenweg solar farm

PVAnlage Gertrudenweg solar farm is a solar farm in Germany with a capacity of 3.4 MW, commissioned in 2009. It is operating and is owned by TroiKomm GmbH.

In 2024 it settled 3.3 GWh of electricity, a load factor of 10.9%. That volume was settled under EEG support.

Its EEG support runs to the end of 2029, after which that output is sold at market prices.

Measured performance vs peers
10.9%
This assetCohort median 10.4%Middle half

This asset produced at 10.9% of nameplate in 2024 — the 61st percentile of German solar commissioned pre-2010 (418 assets with metered output).

Capacity
3.4 MW
Country
Germany
Status
operating
Commissioned
2009
Owner
TroiKomm GmbH
Technology
PV
Measured output 2024
3.3 GWh
Load factor
10.9%
EEG support ends
2029
Peer percentile
61st
Grid connection
MS
State
Nordrhein-Westfalen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE941444611035); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets