Solar farm

PV Struth II Ulrichstein solar farm

PV Struth II Ulrichstein solar farm is a solar farm in Germany with a capacity of 1.1 MW, commissioned in 2021. It is operating and is owned by VOBEG Sonne GmbH & Co. KG.

In 2024 it settled 915 MWh of electricity, a load factor of 9.5%. That volume was settled under EEG support.

Its EEG support runs to the end of 2041, after which that output is sold at market prices.

Measured performance vs peers
9.5%
This assetCohort median 9.7%Middle half

This asset produced at 9.5% of nameplate in 2024 — the 46th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
1.1 MW
Country
Germany
Status
operating
Commissioned
2021
Owner
VOBEG Sonne GmbH & Co. KG
Technology
PV
Measured output 2024
915 MWh
Load factor
9.5%
EEG support ends
2041
Peer percentile
46th
Grid connection
MS
State
Hessen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE941785749862); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets