Solar farm

PV LWD Solar Freifläche Teil 2 solar farm

PV LWD Solar Freifläche Teil 2 solar farm is a solar farm in Germany with a capacity of 1 MW, commissioned in 2022. It is operating and is owned by LWD Solar GmbH.

In 2024 it settled 1.3 GWh of electricity, a load factor of 15.2%. It sold essentially all of that volume outside EEG support — it is already merchant.

Measured performance vs peers
15.2%
This assetCohort median 9.7%Middle half

This asset produced at 15.2% of nameplate in 2024 — the 99th percentile of German solar commissioned 2020 or later (1,271 assets with metered output).

Capacity
1 MW
Country
Germany
Status
operating
Commissioned
2022
Owner
LWD Solar GmbH
Technology
PV
Measured output 2024
1.3 GWh
Load factor
15.2%
Peer percentile
99th
Grid connection
MS
State
Thüringen

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE936242046028); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets