Solar farm

PV Erste und Zweite Pahlen solar farm

PV Erste und Zweite Pahlen solar farm is a solar farm in Germany with a capacity of 3.7 MW, commissioned in 2013. It is operating and is owned by Pahlen Solar Betriebsgesellschaft mbH für erste und zweite Pahlen Solar GmbH & Co. KG.

In 2024 it settled 3.3 GWh of electricity, a load factor of 10.0%. That volume was settled under EEG support.

Its EEG support runs to the end of 2033, after which that output is sold at market prices.

Measured performance vs peers
10.0%
This assetCohort median 10.5%Middle half

This asset produced at 10.0% of nameplate in 2024 — the 36th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
3.7 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Pahlen Solar Betriebsgesellschaft mbH für erste und zweite Pahlen Solar GmbH & Co. KG
Technology
PV
Measured output 2024
3.3 GWh
Load factor
10.0%
EEG support ends
2033
Peer percentile
36th
Grid connection
MS
State
Schleswig-Holstein

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE911977940001); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap