Solar farm

PV Ermetzhofen (Teil 3) solar farm

PV Ermetzhofen (Teil 3) solar farm is a solar farm in Germany with a capacity of 1.8 MW, commissioned in 2013. It is operating.

In 2024 it settled 963 MWh of electricity, a load factor of 6.1%. It sold essentially all of that volume outside EEG support — it is already merchant.

Capacity
1.8 MW
Country
Germany
Status
operating
Commissioned
2013
Owner
Technology
PV
Measured output 2024
963 MWh
Load factor
6.1%

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets

CapexAtlas|ScreenerMap