PV Deponie Weißes Tor Nutha solar farm is a solar farm in Germany with a capacity of 2 MW, commissioned in 2022. It is operating and is owned by GETEC green energy GmbH.
In 2024 it settled 1.9 GWh of electricity, a load factor of 11.1%. It sold essentially all of that volume outside EEG support — it is already merchant.
This asset produced at 11.1% of nameplate in 2024 — the 81st percentile of German solar commissioned 2020 or later (1,271 assets with metered output).
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE957009125954); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets