Peenemünde Polder 1 und 2 solar farm is a solar farm in Germany with a capacity of 7.8 MW, commissioned in 2022. It is operating.
In 2024 it settled 7.7 GWh of electricity, a load factor of 11.3%. Part of that volume was sold outside EEG support, so it is partly merchant.
Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled. All Germany assets