Solar farm

Luckau II solar farm

Luckau II solar farm is a solar farm in Germany with a capacity of 5.7 MW, commissioned in 2011. It is operating and is owned by Bongartz / Hirte Grundstück und Photovoltaik GbR.

In 2024 it settled 5.0 GWh of electricity, a load factor of 10.1%. That volume was settled under EEG support.

Its EEG support runs to the end of 2031, after which that output is sold at market prices.

Measured performance vs peers
10.1%
This assetCohort median 10.5%Middle half

This asset produced at 10.1% of nameplate in 2024 — the 38th percentile of German solar commissioned 2010-2014 (2,063 assets with metered output).

Capacity
5.7 MW
Country
Germany
Status
operating
Commissioned
2011
Owner
Bongartz / Hirte Grundstück und Photovoltaik GbR
Technology
PV
Measured output 2024
5.0 GWh
Load factor
10.1%
EEG support ends
2031
Peer percentile
38th
Grid connection
HS
State
Brandenburg

Sources: asset record from Global Energy Monitor; ownership from the Marktstammdatenregister (DL-DE-BY-2.0); output and subsidy status measured from EEG settlement data for 2024, not modelled; ownership established by research against marktstammdatenregister.de (SEE967062573401); commissioning date and grid connection from EEG-Anlagenstammdaten, with the support end year derived from the EEG’s 20-year tenor. All Germany assets

←CapexAtlas|ScreenerMap